At the initiative of Deputy Minister of National Economy and Finance Nikos Papathanasis, the Modernisation Fund, which falls under his remit, approved five Greek investments to upgrade the energy efficiency of public buildings in its second funding round of 2026, providing a total of €135.4m.
They cover nine hospitals in Attica, Thessaloniki and Pyrgos, 20 schools across all the country’s regions, university buildings in Athens and Thessaloniki, and military facilities belonging to all three branches of the Armed Forces.
Across the five investments, energy savings will exceed 44,000 MWh, while emissions will fall by around 13,570 tonnes of CO₂ a year.
The five proposals were submitted under the coordination of the Ministry of National Economy and Finance’s Special Service for the Social Climate Fund and the Modernisation Fund, in cooperation with the ministries of National Defence, Education, Religious Affairs and Sport, and Health, as well as the implementing bodies.
The investments are as follows:
Health: €40m for nine hospitals
The largest investment in the round covers 14 buildings at nine hospitals: Sotiria, Sismanogleio, Thriasio, KAT, G. Gennimatas, Attikon and Agioi Anargyroi in Kifissia in Attica; G. Papanikolaou in Thessaloniki; and Andreas Papandreou General Hospital in Pyrgos.
Geothermal heat pumps will replace much of the gas-fired heating, while photovoltaic systems will meet some of the electricity needs. The project will save 18,770 MWh a year—the highest figure in the round—and provide more reliable heating and cooling at facilities that operate around the clock.
Education: €64.71m for educational facilities
Under the Ministry of Education, Religious Affairs and Sport’s €32m “100% Green Schools” programme, 20 schools—at least one in every region—will undergo major renovations to eliminate the use of fossil fuels and match their total annual electricity consumption with energy from renewable sources.
Once the work is complete, energy consumption is expected to fall by around 60% and emissions by about 89%, while classroom temperature and air quality will be continuously monitored.
The programme is the pilot phase of a €200m national rollout.
National Defence: €30.7m for military facilities
The Ministry of National Defence is carrying out the third phase of the energy modernisation of its industrial facilities: the 691 Base Industrial Factory in Avlona; the 441 Base Medical Supplies Depot (441 ABYY) in Tavros; Salamis Naval Base and Skaramangas Naval Fort; the 120 Air Training Wing in Kalamata; and an Air Force telecommunications and electronics unit in Glyfada.
Heat pumps will replace diesel and heating oil and, together with insulation, photovoltaic systems and modern equipment, reduce emissions by 1,245 tonnes of CO₂ a year. The reduction will reach 81% at the 441 ABYY.